Taking a multi-trade Santa Rosa project from Planning to final inspection
A multi-trade project in Santa Rosa clears Planning before the Building Division takes it in: Design Review, Hillside Development or Landmark Alteration approval comes first unless the Chief Building Official agrees to concurrent review. Projects that raise water connection fees also sign a Water Demand Offset agreement before the permit is issued. Burned lots in the Resilient City areas follow their own track, with the Planning Director deciding most rebuild reviews.
The houses here
Creek-floodplain ground, a mapped fault and rebuilt hills
Much of Santa Rosa is built on the gently sloping floodplain of Santa Rosa Creek, and in 2016 the U.S. Geological Survey traced the active Rodgers Creek Fault through the central city, in a zone of faulting broader and farther east than earlier maps showed. The small earthquakes clustered near it include aftershocks of the magnitude 5.6 and 5.7 Santa Rosa earthquakes of 1969. The hills are a different kind of site. Fountaingrove was almost entirely open land when the 1964 Hanly Fire crossed it, filled with homes, offices and hotels over the following decades, and burned again in the 2017 Tubbs Fire. Which of these grounds a lot sits on decides much of a contractor's scope before any trade is booked.
- Free to request, no obligation to hire
- Up to five local pros who take this work can reply
- Rules on this page checked against 31 public sources, November 2026
- License for the job
- B General Building: two or more unrelated trades (B&P 7057)
- Planning approvals
- Before plan check, under Building Policy 2.5.11
- Water Demand Offset
- Agreement before issuance when water connection fees rise
- Hillside review
- Any work on the part of a lot sloped 10 percent or more