- 01
A standby generator and its transfer switch
The city's submittal sheet for a residential backup generator asks for a site plan showing the distance to combustible construction and vegetation, typically 5 feet, at least 30 inches to any property line and at least 5 feet to operable doors and windows, plus any trench for gas or conduit. The electrical diagram shows the generator rating, inlet box, disconnect, the lockout device or manual or automatic transfer switch listed for the panel, conductor sizes, grounding and a sign at the main panel giving the location and type of the second power source.
- 02
An EV charger sized by load calculation
Santa Rosa's EV charging checklist asks for a site plan, an electrical floor plan, the charger's listing and a single-line diagram showing panel busbar capacity, breaker sizes and wire. The load calculation follows California Electrical Code Article 220 and counts the charger at 125 percent. Outdoors the connector sits 24 to 48 inches above grade, indoors 18 to 48 inches above the floor. The disconnect carries an Emergency Power Off label, and above 60 amps it must lock open. If the numbers call for a new panel, the plans say so.
- 03
Taking out a Zinsco or other aging panel
A panel or meter-main swap is a building permit, since the city requires one to replace any electrical system the code regulates, and one application can cover the electrical, mechanical and plumbing parts of a project together. The city's SB 407 form names an electrical service change-out as a repair, so on a house built on or before January 1, 1994 it does not trigger the fixture upgrades that a remodel does. A C-10 contractor's load calculation decides whether the new panel stays at 100 amps or goes larger.
- 04
Solar, batteries and a reroof
Licensed contractors can get an instant permit for an eligible rooftop solar system, with or without energy storage, by running the design through SolarAPP+ and then the city's Accela portal; owner-builders apply another way. Since January 8, 2026, a reroof that lifts panels off and puts them back needs a permit with a plan of the panel layout, anchorage spacing and anchorage detail. The city warns that a C-39 roofer without a C-46 Solar license lacks the license to remove and reinstall the panels.
- 05
Getting a voucher rental through NSPIRE
For Housing Choice Voucher units, the city's Housing and Community Services checklist fails missing cover plates, cracked or chipped receptacles and outdoor outlets without weatherproof hinged covers, and it requires GFCI protection on every outlet within six feet of a water source whatever the unit's age. Smoke alarms belong in each bedroom and each hallway serving bedrooms, within 21 feet of every bedroom door, hardwired or on a sealed 10-year battery, with a smoke and a carbon monoxide alarm on each level.