Will The Handyman SF build or oversee my Oakland project?
Not at all. It is a referral service without a contractor's license, so it neither builds nor manages nor inspects anything. Your description goes to up to five local contractors who take this kind of work, and the one you hire signs the contract with you, usually takes out the permit and runs the crew. The Handyman SF does not check licenses, so before you sign, pull up that contractor's record on the CSLB website, cslb.ca.gov, and make sure the classification matches the work.
Our Oakland contractor walked off the job. Can a new one finish under the same permit?
Yes, if the permit is still active. Ask the original permittee to sign the notarized transfer request, or, if they cannot be reached, end the agreement by a letter whose delivery is certified by the Postal Service. The new contractor, who needs a suitable state license class and a current Business Tax Certificate, files a Contractor's Declaration online. Lead paint permits and re-roofing certificates are the exceptions, since the city does not transfer them.
Can an Oakland crew run saws on a Sunday?
For building work the city's chart sets no clock hours, but in a residential area, between 7 a.m. and 9 p.m., the limit is 70 decibels for five minutes maximum in any hour, and persistent construction noise from 9 p.m. to 7 a.m. is a nuisance under OMC 8.18.020. Grading is different: it is barred on Sundays and holidays. A project with design review follows the hours in its conditions of approval.
Does repainting our pre-1978 Oakland house need a permit if nothing else changes?
Usually. Oakland's lead-based paint permit covers painting only, as well as sanding, scraping and pressure washing, on any building put up before 1978. The exemptions are small: under 6 square feet inside per room, or under 20 square feet outside, and windows always count. An owner doing the work on an owner-occupied home is exempt. Apply online, upload the work plan and certifications, pay, and the permit is issued right away.
We bought an Oakland house where the last owner remodeled without permits. What now?
Apply for permits for the work through the city's online portal before a complaint brings an inspector. If a stop work order is issued first, an enforcement fee applies and the permit can be charged at two times the usual fee or more. Once a permit is issued, inspections need to keep coming within six months for it to stay active, and the city asks for disposal receipts at sign-off and closure.