Can one contractor pull every permit for our San Jose project?
Only the ones its license covers. San José lets a contractor pull building, electrical, plumbing or mechanical permits only where they relate to its CSLB classification, and work must be done by contractors holding the correct class, such as B General, C-10 Electrical or C-36 Plumbing. Form 310 has boxes for the building permit and each subtrade permit, so ask which boxes the contractor will check and who will sign for the subtrades.
We bought a house where the garage was closed in without a permit. Is that our problem now?
Yes. Bulletin 202 says neither the passage of time nor a change in ownership relieves the current owner of correcting illegal construction. If wiring or plumbing went in behind drywall, the first step is a Code Enforcement inspection that sets out what has to be opened and permitted. The finished room must then meet current zoning, building and energy codes, so a contractor's bid should cover the inspection findings, not only the visible work.
Will we get the debris deposit back if everything goes to the landfill?
No. The refund requires at least 50 percent diversion, and weight tickets coded as municipal solid waste, trash or rubbish count toward the projected waste without earning any diversion credit. Alternative Daily Cover does not count either. Material can go to a C&D recycling facility certified by the city in your own loads or in a box from a franchised debris box company, the only kind allowed to operate in San José.
Can our contractor's office manager sign the permit application for them?
Yes, as an authorized agent, in one of two ways. The licensed contractor can sign Section C of the building permit application naming the agent, or provide a notarized letter naming the person, dated no earlier than 12 months before the application. The contractor's own license and business tax certificate numbers still have to appear in Section A.
Can a crew work on our San Jose project on a Saturday?
Not near homes, if the job needed a planning approval. Municipal Code Section 20.100.450 bars construction on a site within 500 feet of a residential unit before 7 a.m. or after 7 p.m. on weekdays, and at any time on weekends, unless the development permit or planning approval allows other hours. Because the section applies whenever such an approval is required, a whole-house project on a residential street that went through planning review runs on five working days a week.