Does replacing a living-room window in Mountain View need a permit, or only bedroom windows?
The city's list of projects that need no building permit follows Section R105.2 of the residential code and includes window awnings, but no windows. The escape-opening guide is explicit for sleeping rooms: a permit before work starts, with existing and new floor plans. For other rooms, ask the Building Division by email before ordering, and expect a plan set rather than an online form, since the permits issued online without plans do not cover windows.
Can our contractor file the window permit online without plans, like a water heater?
No. Mountain View issues a set of like-for-like permits online without plans for single-family homes and duplexes, covering items such as AC units, panel upgrades, furnaces, heat pumps, water heaters, siding and tub replacements. Windows are not on that list, and the siding replacement permit is not available when the work includes window replacement, so new siding around new windows goes through regular review.
Our Monta Loma Eichler is not on the Register. Will historic review slow a window job?
The ordinance applies to properties on the Mountain View Register. When the city ran its intensive survey in 2024, previously unidentified R1- and R2-zoned properties were left out at City Council direction, so most tract houses were not studied one by one. The Council is scheduled to take up the updated Register in the last quarter of 2026, so check the address with the Planning Division if the house might be added.
Why do the city's handouts show different glass numbers than our window quote?
Both sheets were revised in June 2023 and are based on the 2022 codes. The egress guide lists U-0.30 for replacement windows and the skylight sheet U-0.55 for small skylights. The 2025 Energy Code sets Zone 4 at U-0.27 for larger window replacements and U-0.40 for any replaced skylight, so a quote written to the newer numbers is not wrong. Confirm with the Building Division before ordering.
Can a historic Mountain View house get new windows without a public hearing?
Under the 2004 ordinance, minor and major alterations to a Register property both go to a hearing. The update scheduled for fall 2026 would let staff approve in-kind window and door replacement as a minor alteration, while new openings stay major. Applications may need an architectural historian's analysis showing that character-defining features are not affected. Ask the Planning Division which version applies on the day you file.