Electrical Petaluma
Electrical work in Petaluma, from condemned panels to SolarAPP+ permits
Petaluma issues panel upgrades as over-the-counter permits, but PG&E's gas-meter setback rule can still force a meter move. For a panel that has actually failed, the city will condemn it on a C-10 electrician's written findings, which lets PG&E allow a like-for-like replacement; the panel must then be replaced or taken out of service within 90 days. The city's 2021 all-electric code for new buildings is now only encouraged.
- Free to request, no obligation to hire
- Up to five local pros who take this work can reply
- Rules on this page checked against 20 public sources, October 2026
Asked most
Panels, permits and power in Petaluma, answered
Does a new house or a major remodel in Petaluma have to be all-electric?
Not anymore. The 2021 reach code required it for new buildings and for remodels removing more than half the exterior walls or adding more than half the floor area. After the Ninth Circuit's ruling against Berkeley's gas ban, the city stopped requiring it and now only encourages all-electric construction. Replacing appliances in an existing house was never covered.
PG&E says our meter must move for a new panel. Is there another way in Petaluma?
Only if the panel has failed. PG&E's variance covers like-for-like replacement of unsafe panels, meaning panels with melted busing or burned internal parts from arcing that are out of power or on partial power. A C-10 electrician documents that on letterhead, the city issues a letter requiring the change-out, and PG&E reviews each case. An old panel that still works follows the normal upgrade rules.
Can our solar contractor get a Petaluma permit without waiting for plan review?
If the job fits SolarAPP+. Petaluma accepts it for rooftop systems on a permitted main house, with no ballasted racking, from a contractor registered with SolarAPP+, on a parcel outside the city's flood zones; the city publishes a search for flood-zone parcels that cannot use it. Projects outside those limits, ground mounts and flood-zone parcels among them, cannot use it.