Electrical Los Altos
Electrical work on Los Altos houses, where new service lines go underground
Los Altos now sends every new or relocated electrical service underground under Chapter 12.38, adopted in October 2025, and treats additions past half the floor area or 750 square feet the same way, adding up three years of permits. Its 2025 reach code asks for 240-volt readiness whenever permitted work changes circuits near a gas dryer or water heater, and for electric-ready conduit beside any new outdoor gas appliance.
- Free to request, no obligation to hire
- Up to five local pros who take this work can reply
- Rules on this page checked against 11 public sources, October 2026
- Undergrounding chapter
- Chapter 12.38, adopted October 28, 2025
- Homes built before 1960
- 45.4 percent, against 22.6 percent countywide
- Rooftop solar permit
- Issued instantly through SolarAPP+ once payment is complete
- Meter connection
- PG&E connects after the city's electric meter release inspection
Get quotes for electrical work in Los Altos
Two short steps. A local pro who takes this work calls or texts you back.
To send a request, call or text (415) 449-8213.
Free to request, and you agree the scope and price with the person you hire before work starts. In California, a job over $1,000 in labor and materials, or one that needs a building permit, must be done by a contractor licensed by the CSLB in the right class. Ask for the license number and check it at cslb.ca.gov.
