Can a Los Gatos panel replacement be permitted online?
Yes, if the existing service panel is 200 amps or less and is being repaired or replaced. The Town lists it among the residential permits in its online system, alongside copper repipes and same-type water heaters. The contractor needs a current Town business license to apply. Other electrical work, including batteries and solar that does not qualify for SolarAPP+, begins as a building pre-application through the same portal.
Will Los Gatos approve a 400-amp service for our chargers and heat pumps?
Ordinance 2380 ties any increase in service capacity to load calculations under California Electrical Code Article 220.83, or 220.87 where metered data exists, that show future loads exceeding the current service, with at least one power management device or a similar measure counted. The Town says its reach code applies once state agencies approve it, so ask the Building Division which rules govern your application date.
Our air conditioner quit. Does the Town make us buy a heat pump?
Only if you replace it. The Town's reach code FAQ says a broken air conditioner may be repaired, and the rule is triggered by installing or replacing one: the new system is either a heat pump or an air conditioner with added efficiency measures. A failed furnace does not trigger it, although the Bay Area Air District's zero-emission standard for furnace replacements begins in 2029.
We want a backup battery for our hillside house. Can it go in a hall closet?
Possibly. The Town's amended residential code allows a storage system in an enclosed utility closet or storage space whose walls and ceilings are finished or noncombustible; unfinished wood framing must be covered with 5/8-inch Type X gypsum board, and the door must be solid or fire-rated and self-closing. It cannot be a bedroom or a closet that opens into one.
Do we need a permit to run power to a small shed in Los Gatos?
Yes for the electrical work, even when the shed itself needs none. The Building Division says a one-story detached shed of 120 square feet or less, no taller than 15 feet, needs no building permit, but electrical or plumbing work in a detached accessory structure does. Zoning setbacks may still apply, so check placement with the Planning Division.