We are only replacing the cabinets and counters in our Milpitas kitchen. Is that a permit job?
Not the boxes and tops themselves: the city lists cabinets, counter tops and similar finish work among projects that need no building permit. Milpitas is strict about what comes with them, though. Installing or repairing a light, switch or receptacle takes an electrical permit, and replacing a defective trap or drain under the sink counts as new plumbing work that needs a permit.
Our house is near Berryessa Creek. Can a kitchen remodel set off the flood-zone rules?
It can, if the house is inside the Special Flood Hazard Area. Milpitas counts an improvement costing 49 percent or more of the structure's value before work as a substantial improvement and adds up improvements over 10 years. The city asks for a recent appraisal and a signed declaration, uses the higher of its valuation data or the contractor's estimate, and then applies the rules for new buildings.
Can our remodeler haul the old Milpitas kitchen away in his own truck?
The city's construction debris page allows two routes: Milpitas Sanitation, the franchise hauler, or self-hauling by the property's owner, occupant or resident in their own vehicle. Self-haulers must keep organic waste such as untreated wood and cardboard apart from other debris. A kitchen remodel that adds no conditioned space does not need the CALGreen recycling report.
We are moving the range closer to the hallway. Does that affect our smoke alarm?
It can. Milpitas's alarm certificate keeps a smoke alarm at least 20 feet from a permanently installed cooking appliance, or 10 feet for a photoelectric alarm or an ionization alarm with a silencing switch. In an open plan where 10 feet would rule out every required spot, a photoelectric alarm may go more than 6 feet away. Alarms must be in place before the final.
Will an induction range change how we permit a heat pump later in Milpitas?
It can. The city's online permit types for a heat pump water heater or a heat pump HVAC system replacing gas equipment are offered only when no electric cooktop or range and no EV charger is already installed in the home. Once the kitchen has induction, those later projects go through the regular permit submittal instead of the online form.