Does my Los Altos business license cover a job in Los Altos Hills?
No. Los Altos Hills was incorporated as its own town in 1956, and its code requires a license tax from every person engaged in business there. The Town's website routes business licensing to its online portal, and because the amount is set by resolution, check the current figure there before the first visit.
Can I get a Los Altos Hills building inspection on a Friday?
No. The Building Department does not schedule or perform inspections on Fridays, and it books them by phone Monday to Thursday. Ask three to four days ahead with the address, permit number, inspection type, date and an AM or PM preference; next-day slots are not always open, and the department will not add one for the day you call.
Does a kitchen remodel in Los Altos Hills trigger the all-electric rules?
It can. Ordinance 611, passed in February 2024, applies the Town's zero-NOx requirements to new buildings and to existing houses undergoing a substantial remodel as the Town defines it. Indoor cooking is one of the exceptions, but a gas range kept under it needs the circuit, the reserved breaker, labeling and space for a future electric cooking appliance shown on the drawings.
Can my crew work in Los Altos Hills on a Saturday?
Yes, from 8 a.m. to 5:30 p.m., but without heavy equipment. Sundays and the listed holidays, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas, are off limits. Owners using their own power tools follow separate hours, 8 a.m. to sunset on weekdays and 9 a.m. to sunset on weekends. Violations can bring misdemeanor charges or a stop to the work.
Who permits septic work on a Los Altos Hills property?
Santa Clara County's Department of Environmental Health, not the Town, issues the permit to build, rebuild or repair an on-site sewage system, and only where a sanitary sewer is not available within 200 feet of the building. The application takes four copies of a scaled site plan showing the system, wells, creeks and structures.