Hot job leads · Pleasant Hill

Pleasant Hill work rules: a 3-month contractor license, 9 a.m. weekends

Contractors based outside Pleasant Hill get their own license category, 62, and can buy it for a year, six months or three, paying the flat rate or a tax on Pleasant Hill receipts, whichever is lower. Weekend work starts at 9 a.m. An exterior-only permit can close on a signed smoke and CO alarm self-certification, and 117 resurfaced street segments sit on a five-year moratorium list that runs to 2028 or 2031.

  • Every new Bay Area job by text, 8 a.m. to 8 p.m.
  • See the job and the price before you pay
  • No subscription, no bidding, STOP anytime
(415) 449-8213Example

New job: TV Mounting in Ellinwood Way, beside I-680, Pleasant Hill. See the job and the price before you pay: thehandymansflive.com/l/…

New job: Plumbing near Walnut Creek. Open the link to see it.

What a lead text looks like. Trade and area are examples.

Join the hot list

Get job leads in Pleasant Hill from today

Three short steps. Your mobile is checked with a texted code, and you are on the hot list the moment you finish.

On the hot list, every new Bay Area job comes to your phone by text, whatever the trade or city, from 8 a.m. to 8 p.m. Jobs in the work and cities you pick here reach you first. A job you have not opened may come once more as a reminder.

  1. 1Pick the work you take
  2. 2Pick the cities you work in
  3. 3Confirm your mobile

Step 1 of 3

Out-of-town contractors
Category 62: flat rate for 12, 6 or 3 months, or gross receipts
Source: phillca.gov
Construction hours
Weekdays 7:30am-7pm; Saturday and Sunday 9am-6pm
Source: phillca.gov
Median home built
1970 (ACS 2019-2023)
Source: data.census.gov
Built in the 1950s
23.6% of 14,320 housing units, the largest decade
Source: data.census.gov

Working legally here

Pleasant Hill's two contractor categories and the January deadline

Anyone conducting business in Pleasant Hill needs a city business license within 30 days of starting, and the tax schedules split contractors by office: Category 60 for those based in the city, Category 62 for everyone else. Both let you pay the lower of a flat rate or a tax on estimated Pleasant Hill gross receipts, and only Category 62 sells the flat license for 12, 6 or 3 months. Licenses expire December 31, except those of contractors based elsewhere; renewals go through the online portal, and from February 1 a 20% penalty grows by 20% a month, up to 100% of the tax. A home base also needs a Home Occupation Permit, and without a fixed address you carry the license and show it on request. The city's guide points anyone offering handyman services to the CSLB.

Source: City of Pleasant Hill, Business License Department

Permits

Pleasant Hill permits: alarm forms, waste plans and street cuts

  • Exterior permits and the alarm self-certification

    The California Residential Code requires smoke and carbon monoxide alarms to be brought up to date whenever a permit is issued for alterations, repairs or additions to a home. When the work is exterior and the inspector never gets inside, the Building Division accepts its own self-certification form instead: the owner and a licensed contractor sign that the alarms are installed and tested, smoke alarms in every bedroom and both kinds outside sleeping areas and on each story. Alarms may stay battery powered when no wall or ceiling finish comes off, and newly installed smoke alarms need 10-year batteries.

    Source: City of Pleasant Hill, Building Division

  • Waste plans: a valuation trigger, and a pass for re-roofs

    Chapter 14.40 of the Municipal Code holds back the building permit for a covered project until the chief building official approves a Waste Management Plan diverting at least 65% of its debris. For homes, the city covers new buildings, demolition-only jobs, anything that adds conditioned area or volume, and projects valued at 50,000 dollars or more. A re-roof that adds no square footage is exempt, as are pools and sheds up to 120 square feet. Plans live in Pleasant Hill's Green Halo portal: upload receipts as the job goes and submit for final before booking the last inspection.

    Source: City of Pleasant Hill, Building Division

  • Street cuts, sewer work and the moratorium list

    Work in the public right-of-way, from trenching a utility across the street to a curb, driveway apron or fence post, takes an encroachment permit from the Engineering Division through the PHill Online Service Center. Its checklist asks for insurance documents that name the city, a traffic control plan, the city business license numbers of the contractor and each subcontractor and, for sewer work, Central San's permit number. Read the five-year moratorium list before you promise a lateral: 117 resurfaced segments, Chilpancingo Parkway and Camelback Road among them, stay on it until August 2028 or July 2031.

    Source: City of Pleasant Hill, Engineering Division

The homes

14,320 homes, with the 1950s and the 1980s each a fifth or more

The ACS 2019-2023 estimates count 14,320 housing units in Pleasant Hill, and the median one was built in 1970. Two decades dominate: the 1950s at 23.6% and the 1980s at 21.7%, while the 1960s add 15.4% and only 8.5% went up after 1999. Detached houses make up 60.8% of units, attached townhouses 9.7% and buildings of 20 or more units 16.1%. Owners live in 63.9% of occupied homes; utility gas heats 61.8% of them and electricity 34.3%. The 2023 Housing Element estimates that fewer than 5% of homes are substandard or need major rehabilitation, and says most of those are bought for remodel and resale with a very quick turnaround.

Source: U.S. Census Bureau

The fountain plaza in downtown Pleasant Hill
The fountain plaza in downtown Pleasant Hill. Photo: ShakataGaNai, CC BY-SA 3.0, via Wikimedia Commons.

Part by part

Pleasant Hill corridors the 2040 General Plan singles out

  • Gregory Lane and Contra Costa Boulevard

    The 2040 General Plan notes single-family homes that take their driveways straight off both arterials and moves them to mixed-use designations, a change it expects to take decades. Until then they remain houses on heavy roads, so stage materials and park off the travel lanes. Gregory Lane itself was reworked in 2020 to slow traffic.

  • Monument Boulevard

    Eastern Pleasant Hill along Monument Boulevard, beside Concord, holds the city's only mobile home park, which the plan keeps while it adds denser retail and housing around it. Single-family streets and Fair Oaks Elementary sit to the south, so manufactured-home repairs and ordinary house work share the same few blocks.

  • Ellinwood Way, beside I-680

    Ellinwood Way runs along I-680 in eastern Pleasant Hill, office buildings beside apartments and business hotels, and the plan would turn those offices into very high-density mixed use, so work there leans toward multifamily units. The freeway itself crosses the city limits for a little over a mile near downtown and sets a few neighborhoods apart from the rest of town.

  • Hookston and the southeast edge

    The Hookston Industrial Area on the far southeast edge holds the only industrial land in the city, ringed by homes, and the plan keeps it for service and manufacturing work. The Pleasant Hill/Contra Costa Centre BART station sits just outside the city limits to the southeast, so confirm jurisdiction before you apply for a city permit near it.

  • Taylor Boulevard and the west edge

    Taylor Boulevard parallels the far western city limits and carries commuters cutting around Contra Costa Boulevard and I-680, and the plan studies traffic calming there rather than new uses. At Taylor and Pleasant Hill Road, the Mangini-Delu property, a former farm zoned R-10 for single-family homes, is one of the largest sites left to build on.

Getting around

A Pleasant Hill workday: 7:30 starts, Friday half days, Thursday evenings

The Building Division posts construction hours under Municipal Code Section 9.15.040 L: 7:30 a.m. to 7 p.m. on weekdays and 9 a.m. to 6 p.m. on Saturdays and Sundays. Inspections run Monday through Thursday from 9:30 to noon and 1 to 3:30, with a 5 to 6 p.m. Thursday slot by appointment, and only 9:30 to noon on Fridays, when City Hall at 100 Gregory Lane closes at 1 p.m. Permits and inspections run through the PHill Online Service Center, and plan-review jobs are invoiced half the permit fee up front. The historic overlay district covers only Rodgers Ranch, so ordinary homes face no historic review.

How hot leads work

From the first text to the homeowner's door

  1. Confirm your mobile

    A texted code proves the number is yours. No app, no password, no card.

  2. A text for each new job

    It names the trade and the area, with a link to the job. Texts go out from 8 a.m. to 8 p.m.

  3. See it before you pay

    The link shows the job and the price. Skip any job you do not want.

  4. Pay, then call the homeowner

    After you pay you get the homeowner's name, number and address. Price and timing are between you.

Questions

Working in Pleasant Hill: what pros ask

Is there a short-term Pleasant Hill business license for a contractor based in Concord?

Yes. Contractors with offices outside the city file under Category 62, which sells the flat-rate license for 12, 6 or 3 months, or lets you pay on estimated Pleasant Hill gross receipts when that comes out lower. In-city contractors under Category 60 get only the yearly flat rate, prorated for a start on or after February 1. Either way the license is due within 30 days of starting, and every business is subject to audit.

Can I start a Pleasant Hill job at 8 a.m. on a Saturday?

No. Weekend construction may run from 9 a.m. to 6 p.m. on both Saturday and Sunday, the hours the Building Division publishes under Section 9.15.040 L of the Municipal Code. Weekdays open earlier, at 7:30 a.m., and run to 7 p.m. Emergency work is the only exception the city lists, so save the saw and the compressor for after nine.

Does a re-roof in Pleasant Hill need a construction waste plan?

Not when it is only a re-roof and the square footage stays the same; the city exempts re-roof-only jobs, pools and small sheds. A residential remodel needs a Waste Management Plan once its valuation reaches 50,000 dollars or it adds conditioned area or volume. The plan must show at least 65% of debris reused or recycled, tracked in the Green Halo portal and submitted for final before the last inspection.

When does a Pleasant Hill job need Central San's approval?

The Building Division's checklist of required approvals lists the Central Contra Costa Sanitary District for adding a bathroom and for tenant improvements, and for some work the plot plan must carry an agency stamp before the city issues the permit. Sewer work in the street needs Central San's permit number before Engineering grants an encroachment permit. The same checklist asks contractors for a city business license, a workers' compensation declaration and a list of subcontractors.

Are handyman jobs in Pleasant Hill the only ones the hot list sends?

No. Whatever the trade or the city, each new Bay Area job is texted as it goes on sale, between 8 a.m. and 8 p.m. A text names the type of work and the area and carries a link; the job details and the price are on that page before you spend anything, and you pay only for the jobs you pick. Nothing is billed monthly, there is no bidding or commission, and STOP turns the texts off.

Where these facts come from

Checked against these public sources in October 2026. Rules and fees change: confirm license and permit requirements with the city before work starts.

  • phillca.gov: Business License
  • phillca.gov: Tax Schedules and Online Applications
  • phillca.gov: CAT 60 2026
  • phillca.gov: CAT 62 2026
  • phillca.gov: BusinessGuide
  • phillca.gov: 2026 Business License Renewal Notice
  • phillca.gov: Business License Compliance
  • phillca.gov: Building Division
  • phillca.gov: Permits
  • phillca.gov: 15052
  • phillca.gov: C D Waste Management
  • phillca.gov: CITY OF PLEASANT HILL CONSTRUCTION AND DEMOLITION MUNICIPAL CODE
  • phillca.gov: GENERAL INFORMATION AND SUBMITTAL REQUIREMENTS
  • phillca.gov: Encroachment Grading Permits

The next job in Pleasant Hill could be yours.

Get hot leads from today

HandymanNow app

Fix it faster. Find work faster.

Homeowners send a job with photos and follow their handyman on the map. Handymen get local jobs by text and take only the ones they want.

WhatsApp (opens WhatsApp)Get hot leads