We're adding a half bath to our White Oaks house. Does that trigger the sewer video?
Yes. A building permit for a project that adds toilets is one of the listed triggers under Chapter 13.05, along with work on more than a quarter of the building and remodels over the city's yearly adjusted cost threshold. The video and the city's inspection report go in with the permit application, and a lateral that fails may have to be replaced at the owner's cost.
Our camera inspection shows Orangeburg pipe. Can it just be patched?
Not under San Carlos rules. The code treats Orangeburg, a fiber pipe of wood pulp and pitch, as already at the end of its design life, and a compliant lateral needs at least 25 years left. Expect a replacement with a cleanout to the city detail and a relief valve, under building and, on the street side, encroachment permits.
Our house is in unincorporated Devonshire, surrounded by San Carlos. Do the city's lateral rules apply?
Not necessarily. LAFCo's 2011 review describes unincorporated Devonshire as an area wholly surrounded by the city, where part is served by the county-run Devonshire County Sanitation District and other developed homes rely on septic systems. The city chapter covers property inside San Carlos or connected to its sewers by an outside service agreement, so confirm which agency serves the lot first.
Who looks after the part of our lateral under the street?
The lateral is the owner's responsibility, but once an approved property-line cleanout is installed, the city takes on maintenance and repair of the lower section in the public right-of-way. A remodel that triggers the video has to add a city cleanout if the house has none, which also puts that lower section on the city's side.
Where does San Carlos tap water come from?
Cal Water's San Carlos system, which has served the area since 1931, bought all of its 2025 supply from the San Francisco Public Utilities Commission and moves it through 112 miles of main, 19 storage tanks and 27 booster pumps. In January 2026 it announced 300 feet of new main just west of Eaton Park, between Crestview Drive and Brittan Avenue, to strengthen flow in an area of varied elevations, with the work expected to finish by the end of February.