Will the City of Concord clear my sewer lateral under the sidewalk?
Only the stretch from its main to a separately installed curbside cleanout that the city has approved and accepted. Above that cleanout the line is yours, and if the lateral has no approved cleanout, the whole pipe to the main is yours. When an overflow is reported, city crews determine whether it came from the public main or a private lateral. In a Central San pocket, ask Central San instead.
Do I need a permit to replace a toilet or kitchen faucet in Concord?
Not if it stays where it is. Concord's bulletin IB-022 requires a permit for replacing a toilet, sink, lavatory, tub or shower only when the fixture is moved. A water heater, water piping, gas piping and sewer line need a permit even as like-for-like replacements, and a replacement dishwasher or softener needs one only where there is no existing air gap.
What are the black specks coming out of my washer hose or water heater?
Often degraded rubber. The Contra Costa Water District has disinfected with chloramines since the early 1980s and says they react with certain rubber hoses and gaskets, such as those on washing machines and water heaters, which then shed black or greasy particles. Replacement parts are common at plumbing supply stores, and a plumber can swap them.
Could my Concord house have a lead water service line?
CCWD says no. Its 2024 inventory of the customer-owned side found no lead or galvanized-requiring-replacement service lines, after physically checking 1,699 lines and prioritizing homes built in the 1940s. The district owns the pipe from the main to the meter; from the meter to the house it is yours.
We're selling. What does Concord's weatherization form ask about plumbing?
Two of its seven questions are plumbing ones: whether the water heater tank has an insulation blanket, and whether every accessible shower has a flow restrictor or a low-flow head. The seller fills in the form for buyers under CMC 13.20.030, and the buyer returns a signed acknowledgement to the city within 14 days after close of escrow.