Plumbing Burlingame

Burlingame pipe work, from the right-of-way cleanout to Hetch Hetchy water

Selling an older Burlingame house brings a sewer lateral test that the city watches in person. Municipal Code 15.12.110 requires a property with buildings more than 25 years old to pass an infiltration test, with any repairs approved before title transfers, and Public Works does not accept a video inspection. Each lateral needs a cleanout in the city right-of-way, which many houses built before the mid-1960s never got. Water comes from SFPUC's Hetch Hetchy system.

  • Free to request, no obligation to hire
  • Up to five local pros who take this work can reply
  • Rules on this page checked against 13 public sources, November 2026

Permits and local rules

Burlingame code and Public Works procedure behind the quote

  1. Municipal Code 15.12.110: inspection at sale

    When property with buildings or structures more than 25 years old is transferred, its laterals must be tested for infiltration and repaired or replaced to stop it, with the work approved before title transfers. The section does not apply to condominium or cooperative buildings except on conversion, for 10 years after an accepted test or approved alterations, for 25 years after a complete replacement, or where piping has fewer than three joints and runs no more than 10 feet.

    Burlingame Municipal Code, Chapter 15.12 (opens in a new tab)
  2. Public Works test procedure

    The test must be witnessed by a city representative, and video inspection is not accepted. An air test is used in hillside areas where water pressure could damage the pipe; it passes if the pressure takes 10 seconds or more to fall from 3.5 to 2.5 psi above any groundwater back pressure. A failed lateral is repaired or replaced and retested, with one free retest, and the city makes no decision about whether buyer or seller pays.

    City of Burlingame Public Works (opens in a new tab)
  3. What the city maintains

    Burlingame's sewers are gravity fed to lift stations and then to the treatment plant at 1103 Airport Boulevard. The city maintains the mains in streets and easements plus the piping from the cleanout at the right-of-way to the main. Rain runoff and underground spring water should be piped to the city's right-of-way and never connected to the sewer main, and new construction needs a new connection on the main, with old connections removed and capped.

    City of Burlingame Public Works (opens in a new tab)
  4. Lead service lines and tap sampling

    The 2025 Water Quality Report says there are no known lead service lines in the city's distribution system and that Burlingame has completed a lead service line inventory covering possible lead on the private side. In 2025 the city collected 30 samples at customers' taps, and none exceeded the action level for lead or copper. The next round of sampling is scheduled for July 2028.

    City of Burlingame Water Division (opens in a new tab)

State license for this work: C-36 Plumbing, C-42 Sanitation System. Look up a contractor's license on the CSLB website (cslb.ca.gov).

Free, no obligation. Next, add your details in the request form.

A shopping street in downtown Burlingame
A shopping street in downtown Burlingame. Photo: Javelinca, CC BY-SA 4.0, via Wikimedia Commons.

The houses here

Laterals older than the city's cleanout rule

Burlingame filled in from 1906 on, and annexing Easton in 1910 brought in the central section of town between Sanchez Creek and Mills Creek. Much of that housing is old enough to fall into a gap Public Works points out: buildings constructed before the mid-1960s were not required to install a cleanout in the city's right-of-way, and city crews cannot relieve a backup on private property. The code's definition reaches the back of the lot as well. A sewer lateral includes piping outside a structure or running between two or more structures, so a rear cottage or a plumbed garage is part of what gets tested at sale.

Neighbourhood by neighbourhood

Where in Burlingame the pipe work changes

  1. Easton Addition and Burlingame Terrace

    Both trace to 1905 surveys, and Burlingame Terrace fills the blocks between Oak Grove Avenue, Broadway, El Camino Real and California Drive. Houses here generally predate the mid-1960s cleanout requirement, so a first sale test often begins with a contractor digging in a right-of-way cleanout under an Encroachment Permit.

  2. Hillside Overlay Zone

    Public Works uses the air test instead of the water test in hillside areas, where the head of a full line could damage the pipe. Water service changes with height too: above 120 feet of elevation the Water Division runs closed systems filled by booster pumps and controlled by pressure reducing valves, while the lowlands get roughly the pressure SFPUC's pipelines deliver.

  3. Burlingame Hills

    This is unincorporated county land, so the city's Chapter 15.12 sale test does not reach it. Its sewers belong to the Burlingame Hills Sewer Maintenance District, governed by the San Mateo County Board of Supervisors and run by the county's Department of Public Works, which is the office to call about a backup at the main.

Free request

Describe the plumbing job once. Local pros who take work in Burlingame reply by call or text.

  • No fee to request, and no obligation to hire
  • You agree scope and price with the pro you choose
  • Photos help them quote without a first visit

Get quotes for plumbing work in Burlingame

Two short steps. A local pro who takes this work calls or texts you back.

To send a request, call or text (415) 449-8213.

Free to request, and you agree the scope and price with the person you hire before work starts. In California, a job over $1,000 in labor and materials, or one that needs a building permit, must be done by a contractor licensed by the CSLB in the right class. Ask for the license number and check it at cslb.ca.gov.

The work

Work that Burlingame's sewer rules hand a plumber

  • Running the witnessed test before a sale

    The contractor or owner first takes out an Encroachment Permit from Public Works and pays the testing fee, then books a city representative to witness the test. In the water exfiltration test, the lateral is plugged at the city cleanout and filled to the foundation or slab level, at least two feet above the lateral at that cleanout, for 30 minutes. It passes if less than four gallons are lost, with no allowance for long or oversized laterals.

  • Adding a cleanout at the right-of-way

    Every lateral tested under the ordinance needs a cleanout in the city right-of-way, and the owner's contractor installs one under an Encroachment Permit if none exists. A cleanout beside the building helps with testing and repair and is required by the plumbing code; that one, and any work on private property, needs a plumbing permit from the Building Division.

  • Unhooking downspouts, yard drains and sump pumps

    Chapter 15.12 declares leaking or broken laterals, uncapped cleanouts, and sump pumps, downspouts or yard drains that discharge into the sewer a public nuisance for the owner to correct. If the council orders abatement and the owner does not act within 30 days of the notice, the city may do the work and assess the cost as a lien on the land, collected on the tax roll.

  • A backwater valve for fixtures below the cleanout

    The city's test procedure says an approved backwater valve shall be installed if any plumbing fixtures sit below the level of the city cleanout, and it needs a plumbing permit. Any fixture lower than the test's water level also has to be plugged, or the lateral plugged at the building, before the line is filled, so a lower-floor bathroom changes how the test is set up.

Before you hire

Ask a Burlingame plumber before the lateral test

  • Check the C-36 Plumbing license at cslb.ca.gov, and ask who will pull the Public Works Encroachment Permit and pay the testing fee.
  • On a house built before the mid-1960s, ask whether a right-of-way cleanout exists or has to be installed first.
  • If any fixture sits below the city cleanout, ask how the backwater valve and its plumbing permit fit into the price.
  • On a hillside lot, ask whether the test will be the air test and whether groundwater back pressure was considered.
  • Ask the plumber to put a gauge on a hose bib before quoting a pressure regulator, since pressure varies with the zone.

Free, no obligation. Next, add your details in the request form.

Questions

What Burlingame owners ask plumbers about sales, laterals and water

Do we need a sewer lateral test to sell our Burlingame house?

If any building on the property is more than 25 years old, yes, unless an exception applies. The lateral must be tested for infiltration and repaired as needed, with the work approved by the city before title transfers. It is the owner's job to determine whether testing is needed, and the city keeps an online database of the tests and replacements it has witnessed since late 1986.

Can a camera inspection replace Burlingame's lateral test?

No. Public Works says video inspection is not accepted for the ordinance test, which has to be witnessed by a city representative. The test is a water exfiltration or air test, and the city notes it only shows whether a lateral lets excess groundwater into the main, not whether the pipe is aligned, graded or free of roots.

Who pays for the test and the repairs when a Burlingame house sells?

The city stays out of it. Its procedure says it neither has made nor will make any determination about who pays for testing and repair; that is for the parties to the sale. A failed lateral gets one free retest. A repaired lateral that passes is good for ten years, and a complete replacement from the building to the city cleanout for 25.

Our Burlingame condo is in escrow. Does it need the lateral test?

No. Section 15.12.110 does not apply to condominium or cooperative apartment buildings or the units in them, except as a condition of converting a building to condominiums or a cooperative. Laterals at condominium buildings remain subject to the chapter's nuisance rules on leaks, uncapped cleanouts and drains connected to the sewer.

Is there lead in Burlingame's water pipes?

The city's 2025 Water Quality Report says there are no known lead service lines in its distribution system, and none of the 30 tap samples taken in 2025 exceeded the lead or copper action level. Lead in household plumbing is the owner's side: the report recommends running water for several minutes after it has sat for hours, or using a filter rated to remove lead under a standard from an ANSI-accredited body.

Plumbing work in Burlingame? Tell us what you see.

One request reaches local handymen and contractors who take this work. The Handyman SF connects you with them; it does not do the work.

HandymanNow for handymen Work in Burlingame? Get job leads by text. Pick your trades and areas, take only the jobs you want. No subscription. Start getting leads HandymanNow for homeowners Get the HandymanNow app. Send a request with photos, message your handyman and follow them on the way. Download the app

HandymanNow app

Fix it faster. Find work faster.

Homeowners send a job with photos and follow their handyman on the map. Handymen get local jobs by text and take only the ones they want.

Call WhatsApp (opens WhatsApp) Free quote