Plumbing Berkeley
Berkeley plumbing under the city's own sewer lateral law
The plumbing job that holds up a Berkeley house sale is the sewer lateral, and the rules are the city's own rather than EBMUD's regional ordinance. A Sewer Lateral Certificate is needed before escrow closes and before a permit for a large remodel, and unless the lateral was replaced in the last twenty years, it earns one by passing a water or air test a city inspector watches. A second local rule rides on every plumbing or mechanical permit: a motion-activated gas shutoff valve.
- Lateral law
- BMC Chapter 17.24, in force since October 2006
- Certificate life
- 20 years after full replacement; 7 after a repair or a clean pass
- Gas valve rule
- Motion-activated shutoff with any plumbing or mechanical permit
- Lateral office
- Public Works Engineering, 1947 Center Street
Get quotes for plumbing work in Berkeley
Two short steps. A local pro who takes this work calls or texts you back.
To send a request, call or text (415) 449-8213.
Free to request, and you agree the scope and price with the person you hire before work starts. In California, a job over $1,000 in labor and materials, or one that needs a building permit, must be done by a contractor licensed by the CSLB in the right class. Ask for the license number and check it at cslb.ca.gov.
